OLD-FIELD SUCCESSION : Looking north from grid stake G5.
January 1997

The area in the foreground will become part of Plot C, a 40-year-rotation plot, and Plot D, a 10-year-rotation plot.

The area was cleared prior to the start of NATL for disposal of clay excavated during the construction of the medical center.

The woods in the background will be cleared to become part of Plots A and B.

February 2007

In the foreground on the left is Old-field Plot C, a 40-year-rotation plot started in 2000, and the trail between plots.

In the foreground on the right is Old-field Plot D, a 10-year-rotation plot started in 1997): cleared of trees, except for lone peach tree (center), in preparation for re-start during 2007.

In the near background are Plots A and B, which have been cleared of trees except for longleaf pines.