OLD-FIELD SUCCESSION : Looking east from grid stake H4.
January 1997

The area in the foreground is to become part of Old-field Plots B and E.

The area beyond is a retention basin that will be re-contoured to become the centerpiece of SEEP.

In the background is the EYN building and greenhouse complex.

February 2007

In the foreground to the left of the near sign is Old-field Plot B, which is to be re-started nearly every year.

In the foreground to the right of the near sign is Old-field Plot E, which is to be started in 2020.